We've been too busy to post just recently - but we're still getting things done on the house. It has mainly been more of the same, so no interesting pictures either. We have finished all the 100mm Kingspan between the rafters upstairs, and as said previously this was a horrible job, so glad that's finished.
A busy weekend coming up - We have got to lay the kingspan in the floors, tape all the joints, and install the Electric Underfloor Heating ready to pour the floor screed next week. This means inside will be off-limits for a few days while it dries out, so we are hoping for some dry weather next week so we can carry on outside. (odds on it will be wet, so we might get a little holiday!)
Diary detailing the trials and tribulations of a Self Build Project in Pantymwyn, North Wales. The build is a timber frame construction and will incorporate high levels of insulation - Air Tightness Membrane - MVHRHP System - Energy efficient lighting etc and so will be some way towards a 'LOW ENERGY' House.