Matt sparked up the EUFH (Electric Underfloor Heating) today, and what do u think happened?
Please Vote on the poll opposite :-))))
Diary detailing the trials and tribulations of a Self Build Project in Pantymwyn, North Wales. The build is a timber frame construction and will incorporate high levels of insulation - Air Tightness Membrane - MVHRHP System - Energy efficient lighting etc and so will be some way towards a 'LOW ENERGY' House.
Friday, 29 October 2010
Thursday, 28 October 2010
Lights & Sockets
Matt from Excel Electrical was on-site today - we have made a start on the lights/sockets/switches. Not very exciting pics but here goes. We are hoping to spark up the underfloor heating tomorrow - so if you hear that 8 fire engines are attending a house fire in Mold then you know it all went wrong!!:-)))
Wednesday, 27 October 2010
2nd Fix Electrics Starts Thursday
Lights and Sockets will be installed tomorrow. Will be able to turn on the lights and work into the night then....
Sunday, 24 October 2010
We're Back!
I know - it's been a while. Sooo much has happened since last post. Apart from what's happened at the house, I've got a new job at work and had to go USA for a training course, work now demanding more of my time... if ever there was a time to get promoted this was not it!!
Looking back at the blog, We are trying to remember whats gone on - we have had to put in new drainage - this has been a problem since we moved into the old Delfryn - badly installed by the council and shared with the neighbour. We now have a properly installed drain of our own, but not before breaking the water pipe in the road and cutting the whole street off!!!
The garden has been re-landscaped and all new retaining walls in the front and back garden. We have had a Slab put in for a nice size garage next year in the back garden.
All the plastering has been finished - if ever a trade has given us problems it has been the plastering - badly let down by the first couple then we managed to get a good one who finished the job off for us.
Staircase has been put in and looks great, also most of the second fix joinery has been done, bits to finish off but not much.
LOTS and LOTS of painting and floor tiling - the floor tiling has nearly put me in hospital but i pleased to say that 95% of that is done - we have a bit to do in the bathrooms when the boxing in is done - but apart from that we are tiled and grouted - thank god for that!
The elecricty cable to the post was done as part of the re-landscaping, we now have a electricity feed and everything! First Fix Lekky is done and second fix is underway tuesday. We have 48 downlights to put in and a lot of sockets etc. We are have got economy 7 meter installed as part of the underfloor heating thing.
I also installed a CAT6 high speed computer network and a lot of cabling for an Alarm system.
The Lindab guttering was completed - again another job that seemed to drag on a little....
anyway heres the pics taken today....
relandscaped garden and retaining walls - anyone who has been the house before will know our garden used to slope down from the field behind - you can see from this pic that we have taken a lot of stuff off the top to give ourselves a flat piece of lawn...
Looking back at the blog, We are trying to remember whats gone on - we have had to put in new drainage - this has been a problem since we moved into the old Delfryn - badly installed by the council and shared with the neighbour. We now have a properly installed drain of our own, but not before breaking the water pipe in the road and cutting the whole street off!!!
The garden has been re-landscaped and all new retaining walls in the front and back garden. We have had a Slab put in for a nice size garage next year in the back garden.
All the plastering has been finished - if ever a trade has given us problems it has been the plastering - badly let down by the first couple then we managed to get a good one who finished the job off for us.
Staircase has been put in and looks great, also most of the second fix joinery has been done, bits to finish off but not much.
LOTS and LOTS of painting and floor tiling - the floor tiling has nearly put me in hospital but i pleased to say that 95% of that is done - we have a bit to do in the bathrooms when the boxing in is done - but apart from that we are tiled and grouted - thank god for that!
The elecricty cable to the post was done as part of the re-landscaping, we now have a electricity feed and everything! First Fix Lekky is done and second fix is underway tuesday. We have 48 downlights to put in and a lot of sockets etc. We are have got economy 7 meter installed as part of the underfloor heating thing.
I also installed a CAT6 high speed computer network and a lot of cabling for an Alarm system.
The Lindab guttering was completed - again another job that seemed to drag on a little....
anyway heres the pics taken today....
relandscaped garden and retaining walls - anyone who has been the house before will know our garden used to slope down from the field behind - you can see from this pic that we have taken a lot of stuff off the top to give ourselves a flat piece of lawn...
The kitchen is finished but we need the electrics finishing off as part of 2nd fix this week... you can see some of the floor tiles here ... about 25 Sq M in Kitchen..
View from Alexs bedroom downstairs into the lounge- here you can see the staircase and more floor tiles..
View into the downstairs hall from the lounge. Room at the end is the Study/Computer room
.View from master bedroom - well is was a nice day today..
Hall upstairs and a 'Sun Tunnel' in the ceiling giving light - nice oak banister / railings ( still need sanding and oiling )..
View from upstairs bathroom where the sink will be - looking forward to cleaning my teeth looking out this window!
Retaining walls at the front and some stoning done on the front drive etc..
Lindab Guttering finished.. Hooray!
Friday, 22 October 2010
Get Ready For Update
Hi Blog fans. we will be updating the blog this weekend sometime..... get ready for lots of pics and maybe some video....
Subscribe to:
Posts (Atom)